Portfolio · 04
A residence at Ahlan
Taken on after four years of absentee management, and returned to standard over eighteen months.
- District
- Ahlan
- Kind
- Residence · two bedrooms
- Aspect
- East, to the city
- Held
- Under stewardship since 2023
We inherited this one in poor order — not damaged, but tired in the specific way a building becomes tired when it has been attended to only when something breaks.
The recovery was deliberately slow and sequenced so the owner never faced a single large bill. It reached standard in the autumn of 2024 and has held there since.
The record
- Recovered to standard over eighteen months
- Plumbing and hot water renewed, 2023
- Joinery repaired rather than replaced
- Weekly attendance since February 2023